Two sets of rules: State ADUs and Ordinance ADUs
Los Angeles separates ADUs into two kinds. State ADUs are the units California requires every city to approve on a set path, with only a few standards allowed. Ordinance ADUs are built under the City's own ADU ordinance, which allows larger units but brings more of the zoning code with it. You can combine them: for example, a detached State ADU with an attached Ordinance ADU. (ZA Memo 143, Rev. 1; LAMC § 12.22 A.33)
The City's ordinance dates from 2019 and is being rewritten. Until a new one is adopted, LA applies state law wherever the two conflict. (ZA Memo 143, Rev. 1)
How many units on a single-family lot
On a Woodland Hills single-family lot the City must approve, in any combination: (Gov. Code § 66323(a))
- One converted ADU inside the house or an existing accessory structure such as a garage. It may grow by up to 150 sq ft to make room for an entrance.
- One junior ADU (JADU) inside the house, attached garage included.
- One detached, new-construction ADU with 4-foot side and rear setbacks. The City may cap this one at 800 sq ft and the state height limit, and nothing else.
That is the "1 + 1 + 1" the state housing department describes. (HCD ADU Handbook, March 2026)
Size
| Unit | Size rule | Source |
|---|---|---|
| Detached State ADU | Up to 800 sq ft is guaranteed, with 4-ft side and rear setbacks | Gov. Code § 66323(a)(2) |
| Detached Ordinance ADU | Up to 1,200 sq ft and two stories; the lot's floor-area limits apply | LAMC § 12.22 A.33 |
| Any local size cap | Cannot be set below 850 sq ft, or 1,000 sq ft for more than one bedroom | Gov. Code § 66321(b) |
| Converted ADU | The existing space, plus up to 150 sq ft for an entrance | Gov. Code § 66323(a)(1) |
| JADU | Up to 500 sq ft of interior livable space, inside the home | Gov. Code §§ 66313, 66333 |
How the area is measured. Since January 1, 2026, state law measures ADU size as interior livable space. The City's August 2025 memo measured State ADUs by gross floor area. Confirm how LADBS measures your unit before you design right to the limit.
Height
- Detached ADU: at least 16 ft must be allowed. (Gov. Code § 66321(b)(4))
- Detached ADU near transit: 18 ft within a half-mile walk of a major transit stop or high-quality transit corridor, plus 2 ft for a roof pitch that matches the house. Whether a lot qualifies depends on its walking distance to a qualifying stop, so check your parcel.
- Attached ADU: 25 ft or the zone's height limit, whichever is lower.
Setbacks
- New detached or attached ADU: no more than 4 ft from the side and rear lot lines. (Gov. Code § 66314(d)(7))
- Garage or other conversion: no setback for existing space converted in place, or rebuilt in the same location and to the same size.
- Front yard: the base zone's front yard still applies to Ordinance ADUs; it cannot be used to block an 800 sq ft State ADU.
Building code separation still applies: walls less than 5 ft from a lot line must be fire-rated with limited openings. See garage conversions.
Parking
Where parking can be required at all, the limit is one space per ADU or per bedroom, whichever is less. (Gov. Code § 66314(d)(10)) No parking can be required when any of these apply: (Gov. Code § 66322(a))
- The lot is within a half-mile walk of public transit. Lots near the Metro G Line's Pierce College station may qualify; measure the walk from your lot.
- The ADU is part of the house or an existing accessory structure, such as a converted garage.
- On-street permits are required but not offered to the ADU occupant, or a car-share vehicle is within one block.
When a garage or carport is converted or demolished for an ADU, the lost spaces never have to be replaced. (Gov. Code § 66314(d)(11))
Owners and rentals
- ADU: the City cannot require you to live on the property. It can require rentals to be longer than 30 days. (Gov. Code § 66315)
- JADU: owner occupancy can be required only if the JADU shares a bathroom with the house. JADU rentals must be longer than 30 days, and a deed restriction is recorded. (Gov. Code § 66333)
Fees
- Impact fees: none on an ADU of 750 sq ft or less, or a JADU of 500 sq ft or less. Above 750 sq ft, fees are proportional to the size of the main house. (Gov. Code § 66311.5) In Los Angeles these are the Residential Development Fee and Dwelling Unit Construction Tax; ADUs are exempt from park fees and the Affordable Housing Linkage Fee. (LADBS IB P/BC 2026-150)
- School fees: LAUSD charges $5.38 per sq ft on ADUs over 500 sq ft (rate effective August 11, 2026).
- Utilities: a converted unit inside existing space cannot be required to get a new utility connection. (Gov. Code § 66311.5(d))
LADBS plan check and permit fees are charged on top of these.
Sprinklers, selling separately, legalizing
- Fire sprinklers are not required in an ADU if they are not required for the main house, and an ADU cannot trigger sprinklers in the house. (Gov. Code §§ 66314(d)(12), 66323(d)) Hillside fire-zone lots have their own rules: see Hillside & fire zones.
- Selling an ADU separately as a condominium is allowed only where a city adopts an ordinance for it. Los Angeles has proposed one in its draft ADU ordinance; it is not law yet. (Gov. Code § 66342)
- Unpermitted units built before January 1, 2020 can be legalized: the City cannot deny the permit for code or ordinance issues unless the unit is substandard under health and safety law. (Gov. Code § 66311.7; LADBS IB P/BC 2026-161) Read legalizing an unpermitted ADU.
Coming in 2027
Two 2026 state laws take effect January 1, 2027:
- AB 956 raises the number of detached new-construction ADUs a city must approve on a single-family lot to two. Where two detached ADUs are built, a JADU does not have to be approved too.
- SB 1117 charges impact fees on an ADU over 750 sq ft only on the area above 750 sq ft, for up to two ADUs on a lot.
Los Angeles is also rewriting its ADU ordinance. Follow both on the news page.
Sources
- Gov. Code § 66323
- Gov. Code § 66321
- Gov. Code § 66314
- Gov. Code § 66322
- Gov. Code § 66333
- Gov. Code § 66311.5
- HCD ADU Handbook (March 2026)
- LAMC § 12.22 A.33 (Ordinance 186,481)
- ZA Memo 143, Revision 1 (Aug. 1, 2025)
- LADBS IB P/BC 2026-150, ADU conversion of existing structure (rev. Aug. 13, 2026)
- LAUSD developer fee rate (Aug. 11, 2026)